Pictures from Katrins breakthrough
[2008-04-22]

About 500 guests wittnessed the breakthrough.
The Minister of Infrastructure in the Citytunnel
[2008-02-05]

Åsa Torstensson took a ride with the tunnel bore machine Katrin.
The boring of the Citytunnel in Malmö is finished
[2008-04-22]

On Monday the tunnel boring machine Katrin broke through the concrete wall at Malmö C which concludes one of the most difficult tasks of the Citytunnel.